Industrial Clusters
 
 
 
 
 
 
 
 
 
  
Phân loại
  
  
  
  
  
Tóm tắt
  
  
  
  
Nội dung
List of incentive policies to attract investment in Binh Duong province Preferential and attractive policyBài viếtList of incentive policies to attract investment in Binh Duong province /Style Library/LacViet/CMS2013/Images/newsdefault.jpg
PORTAL - The Binh Duong People's Committee issued a document announcing the list of incentive policies to attract investment.
9/9/2020 3:00 PMNoĐã ban hành

I. Projects in the field of industrial production:

1. Land rental (Pursuant to Decree No. 135/2016 / ND-CP dated September 9, 2016 and Decree No. 46/2014 / ND-CP dated May 15, 2014 of the Government):

Exemption of land and water surface rent for the entire land lease term for projects on construction of infrastructure for common use in industrial parks and industrial clusters according to the plan approved by competent authorities.

Exemption of land and water surface rent for 03 years since the project is completed and put into operation, for projects on the list of investment incentives under the provisions of Decree No. 118/2015/ND-CP dated November 12th, 2015 of the Government; for new business establishments of economic organizations that are relocated according to planning or due to environmental pollution.

Exemption of land and water surface rent for 11 years for investment projects on the list of special investment incentives as prescribed in Decree No. 118/2015 / ND-CP dated November 12, 2015 of the Government.

2.  Corporate income tax

a) Preferential tax rate of 10% for 15 years and tax exemption for 04 years, 50% reduction of payable tax for the next 9 years for: (Clause 1, Article 15 and Clause 1, Article 16, Decree No. 218/2013 / ND-CP dated December 26, 2013 of the Government; Clause 1 Article 3 of Circular No. 212/2015 / TT-BTC dated December 31, 2015):

Income of enterprises from implementing new investment projects in the fields of: Scientific research and technological development; manufacturing software products; production of composite materials, light construction materials, and rare and precious materials; renewable energy production, clean energy, energy from waste destruction; biotechnology development;

Income of enterprise from implementing new investment projects in the field of environmental protection includes:

  • Production of equipment to treat environmental pollution.
  • Production and application of environmental protection inventions which are protected by the government in the form of invention patents or utility solution patents.
  • Production of eco-friendly products labeled with Vietnam's Green Label by the Ministry of Natural Resources and Environment; products from recycling and waste treatment certified by competent state agencies.
  • Production of certified gasoline, diesel fuel and biofuel; Biochar; energy from wind, sunlight, tides, geothermal and other forms of renewable energy.
  • Manufacture of machinery, equipment and means used directly in the collection, transportation and treatment of wastes; environmental monitoring and analysis; renewable energy production; Treatment of environmental pollution; respond and handle environmental incidents.
  • Manufacture of equipment for environmental monitoring and analysis
  • Treatment of pollution and environmental protection; Collection and wastewater and exhaust gas treatment; centralized solid waste collection, transportation and treatment; Recycling and reusing waste; daily-life wastewater treatment with capacity of 2,500m3 of wastewater or more one day for urban areas of grade IV or higher; treatment and improvement of polluted environmental areas in public areas; response and handling of oil spills, chemical incidents and other environmental incidents; building technical infrastructure for environmental protection in industrial parks and clusters of trade villages; cremation service, electric cremation; environmental damage assessment; environmental health assessment; assessment of the environment for goods, machinery, equipment, and technology.
  • High-tech enterprises, agricultural enterprises that apply high technology.
  • An enterprise's income from implementing new investment project in the manufacturing sector (except for projects on production of goods subject to special consumption tax, mineral exploitation projects) meets one of the following two criteria:

+ Projects with minimum investment capital of VND 6 trillion, disbursed no more than 3 years after being granted investment licenses and having minimum total revenue of VND 10 trillion per year at least 03 year since the revenue was generated.

+ Project with minimum investment capital of VND 6 trillion, disbursed within 03 years after being granted investment licenses and employing more than 3,000 employees at least 03 year since the revenue was generated.

b) The tax rate of 17% in 10 years and tax exemption in 2 years and 50% reduction of tax payable in the next 04 years are applicable to: (Clause 3, Article 15 and Clause 3, Article 16, Decree No. 218/2013 / ND-CP dated December 26, 2013 of the Government):

  • Enterprise's income from new investment projects: High-class steel production; manufacturing energy-saving products; manufacture of machinery and equipment for agricultural, forestry, fishery and salt production; manufacture of irrigation equipment; feed production and refining for livestock, poultry and aquatic animals; developing traditional professions.

The approval criteria, application conditions, tax calculation method and other regulations related to tax incentives are specified in Decree No. 218/2013 / ND-CP dated December 26, 2013 of the Government and Decree No. 12/2015 / ND-CP dated February 12, 2015 of the Government.

Enterprises having investment projects to develop investment projects which are operating in the eligible fields and areas for corporate income tax incentives in accordance with the provisions of Decree No. 218/2013 / ND-CP dated December 26, 2013 of The Government on expanding production scale, increasing capacity, and innovating production technology. If one of the three criteria specified in this Clause is met, it may be selected to enjoy tax incentives according to projects that are operating for the remaining period (if any) or tax exemption or reduction for the additional income from expansion investment. The tax exemption or reduction period for the additional income due to the expansion investment specified in this Clause is equal to the tax exemption or reduction period applicable to new investment projects in the same areas or sectors with corporate income tax incentives.

3. Import tax (Pursuant to Decree No. 134/2016 / ND-CP dated September 1, 2016 of the Government):

Tax exemption for imported goods to create fixed assets of incentive beneficiaries under the law on investment, including:

  • Machines; equipment, components, detachable parts, spare parts for synchronous assembly or synchronous use with machinery or equipment; raw materials and supplies used to manufacture machinery or equipment or to manufacture components, detachable parts, and spare parts.
  • Specialized means in the technological line directly used for production activities of the project;
  • Construction materials cannot be produced domestically.

II. Projects in the field of agriculture and rural areas:

1.  Land use levy exemption or reduction:

Subjects entitled to land use levy exemption or reduction; Exemption or reduction of land and water surface rents of the State; Exemption or reduction of land use levy upon change of land use purpose is specified in Article 5,6,7,8 of Decree No. 210/2013 / ND-CP dated December 19, 2013 of the Government on encouraging   businesses to invest in agriculture and rural areas.

In addition, economic organizations, households and individuals that are leased land by the State according to the provisions of the Land Law to grow rubber tree with the rubber plantation area are re-cultivated from January 1, 2015 to December 31, 2020 is exempt from land rent according to Official Letter No. 9549 / BTC-QLCS dated July 12, 2016 of the Ministry of Finance, as follows:

  • In cases the replanting has been carried out before January 1, 2015 but still in basic construction period, the land rent is exempted for the remaining time of basic necessity from January 1, 2015 but no more than December 31, 2020.
  • In case the replanting is carried out in the period from January 1, 2015 to December 31, 2020, the land rent exemption period is from the beginning to the end of the re-cultivation but no more than 31/12/2020.
  • Projects to invest in agriculture and rural areas in Binh Duong province are on the list of fields with special investment incentives in agriculture and rural areas specified in Decree No. 210/2013 / ND-CP dated December 19, 2013 of the Government on encouraging enterprises to invest in agriculture and rural areas to enjoy the following incentives:
  • In case of land allocation by the State, a 50% reduction of land use fees must be paid to the State budget for such investment project.
  • In case of land or water surface lease from the State, they will be exempt from land rent or water surface rent for 11 years from the date the project is completed and put into operation.

2.  Corporate income tax:

a) Apply the tax rate of 10% to the following incomes (Clause 2, Article 15, Decree No. 218/2013 / ND-CP dated December 26, 2013 of the Government)

Income of the enterprise from: planting, tending and protecting forests; production, multiplication and crossbreeding of plants and animals; post-harvest preservation of agricultural products, preservation of agricultural, aquatic and food products.

  • A preferential tax rate of 10% in 15 years for: income of enterprises from implementing new investment projects in the fields of: scientific research and technological development; applying high technologies on the list of high technologies given priority for investment and development under the provisions of the Law on High Technologies; High-tech incubation, high-tech business incubation; investment in construction - business in hi-tech incubators and hi-tech business incubators; development of biotechnology.

b) Exemption of corporate income tax (Clause 2 Article 8 of Circular No. 78/2014 / TT-BTC dated June 18, 2014) for:

  • Income from the implementation of technical services directly serving agriculture includes: income from irrigation and drainage services; harrowing land; dredging of canals and interior fields; pest and disease control services for plants and animals; service of harvesting agricultural products.

3. Import tax:

  • Import tax exemption for domestic equipment and technology that cannot be exported for businesses implementing hi-tech agricultural projects;
  • Import tax exemption for plant varieties; livestock breeds; fertilizers and plant protection drugs that cannot be produced domestically and need to be imported according to regulations of competent state management agencies (Pursuant to the Law on Import and Export);
  • Import tax exemption for imported goods to create fixed assets for enterprises according to regulations (Pursuant to Decree No. 134/2016 / ND-CP dated September 1, 2016 of the Government).

4. Authority of recognition: hi-tech agricultural enterprises and hi-tech agricultural regions.

  • For agricultural enterprises applying high technology: According to Article 2 of Circular No. 50/2011 / TT-BNNPTNT of the Ministry of Agriculture and Rural Development guiding the implementation of Decision No. 69/2010 / QD - On November 3, 2010 of the Prime Minister on the authority, order and procedures for recognition of agricultural enterprises applying high technology, "the Ministry of Agriculture and Rural Development has the authority to issue the certificate to agricultural enterprises applying high technology ".
  • For hi-tech agricultural areas: According to Article 3 of the Prime Minister's Decision No. 66/2015 / QD-TTg dated December 25, 2015 on criteria, competence and order and procedures for recognition for hi-tech agricultural areas, "the Provincial People's Committee has the authority to issue the certificate to the hi-tech applied agricultural areas".

III. Housing investment project for industrial park workers and low-income housing in urban areas:

1.     Exemption from land use levy, land rental (Pursuant to the Decree No. 46/2014 / ND-CP dated May 15, 2014 of the Government)

Enterprises are exempt from land use levy and land rental for the entire lease term.

2. Corporate income tax {Clause 1, Article 15, Decree No. 218/2013 / ND CP dated December 26, 2013 of the Government)

The tax rate of 10% is applied to the enterprise's income from implementing projects on social housing investment and business for sale, for lease, or for lease purchase with the subjects specified in Article 53 of the Law on Housing.

Social houses specified in this Clause are houses built by the State or organizations and individuals of all economic sectors and meet criteria for housing, selling prices and rental prices, rental purchase price, the objects, the conditions to be purchased, leased or buy social house in accordance with the law on housing and the income determination is subject to the 10% tax rate. This Clause does not depend on the time of signing the sale, lease or lease purchase social housing contract;

3. Import tax (Pursuant to the Government's Decree No. 134/2016 / ND-CP dated September 1, 2016).

Import tax exemption for imported goods to create fixed assets for enterprises according to regulations.

IV. Projects in the fields of education - training, vocational education, healthcare, culture, physical training and sports, environment, judicial assessment:

Pursuant to (Decree No. 59/2014 / ND-CP dated June 16, 2014 amending and supplementing Decree No. 69/2008 / ND-CP dated May 30, 2008 of the Government)

1. Land rent exemption or reduction:

The socializing establishment may be leased with annual rental payment by the State or leased land with one-off rental payment for the entire lease term and may be considered for land rental exemption or reduction depending on the area as follows:

  • For communes and towns: land rent exemption for the entire land lease term.

·      For communes and wards: the number of years with land rental exemption is calculated by 50% of the land lease period.

Conditions and procedures for land rental exemption and reduction are specified in Decision No. 44/2016 / QD-UBND dated November 1, 2016 of the Binh Duong People's Committee.

2. Corporate income tax (Clause 2, Article 15 of the Government's Decree No. 218/2013 / ND-CP dated December 26, 2013)

Projects with income from socialization are subject to a 10% corporate income tax during their operation. Newly established projects are eligible for tax exemption for 4 years from the time they have taxable income and 50% reduction of payable tax amounts for the next 5 years.

3. Incentives on credit and capital mobilization:

It is stipulated in Article 9, Article 10 of Decree No. 69/2008 / ND-CP dated May 30, 2008 of the Government.

4. Import tax

Import tax exemption for imported goods to create fixed assets for enterprises according to regulations (Pursuant to Decree No. 134/2016 / ND-CP dated September 1, 2016 of the Government).

V. Incentive policies for projects on manufacturing supporting industrial products on the List of supporting industrial products prioritized for development

1. Corporate income tax:

Corporate income tax rate 10% for 15 years (Clause 1, Article 13, Law on Corporate Income Tax No. 14/2008 / QH12 of the National Assembly and Clause 5, Article 1, Law on Book 71/2014 / QH13 amending and supplementing a number of articles of tax laws)

2. Import tax:

Import tax exemption for imported goods to create fixed assets in accordance with the Law on Import Tax and Export Tax and its guiding documents.

3. Market development support:

It is prioritized to participate in provincial trade promotion program, national trade promotion program.

Partly support the cost of trademark registration, participation in domestic and foreign trade fairs and exhibitions and funding for market information access.

4. Support for application and transfer (Article 5, Decree No. 111/2015 / ND-CP dated November 3, 2015 of the Government)

  • Organizations and individuals transferring supporting manufacture technology products on the List of supporting industry products prioritized for development are entitled to incentives from the law on technology transfer and other incentives under the current regulations.
  • Technology application and transfer activities to manufacture supporting industry products on the List of supporting industries prioritized for development supported by the Supporting Industry Development Program are as follows:

+ Projects and schedule on cooperation between manufacturing enterprises and units having technologies applied in technology transfer shall be partially funded;

+ The cost of manufacturing and testing supporting industry products on the List of supporting industry products prioritized for development is supported up to 50%.

+ The State shall support up to 75% of the cost of technology transfer for a material production project using more than 85% of the raw materials that are products of the deep processing of domestic minerals, including metal ores, non-metal ores and petrochemical products for the production of supporting industrial products.

5. Support for human resource development: (Article 6, Decree No. 111/2015 / ND-CP dated November 3, 2015 of the Government)

  • Human resource training for supporting industry:

+ Project of manufacturing supporting industry products on the List of supporting industry products prioritized for development is supported with funds from the Program on Supporting Industry Development for Human Resource Training;

+ Individuals directly performing the tasks of the Supporting Industry Development Program are given priority in training to improve their domestic and foreign qualifications according to state training programs.

  • Institution of Human resource training for supporting industries:

+ The State encourages organizations and individuals to invest, enter into joint ventures and cooperation to build human resource training facilities direct for production of supporting industrial products;

+ Institutions of Human resource training for production of supporting industrial products are funded and supported by science and technology funds, training and other funds;

The State encourages the existing universities, research institutes and training institutions to participate in the training of human resources for the supporting industry.​

6. Incentives for small and medium – sized enterprises: (Clause 2, Article 12 of Decree No. 111/2015 / ND-CP dated November 3, 2015 of the Government)

In addition to general incentives, small and medium-sized enterprises who manufacture supporting industry products on the List of supporting industry products prioritized for development are also entitled to the following incentives:

  • Investment credit: enterprises can borrow up to 70% of investment capital in credit institutions on the basis of guarantees of credit guarantee institutions for small and medium – sized enterprises as prescribed if the following conditions are met:

+ Total value of assets mortgaged or pledged at a credit institution in accordance with the law at least 15% of the value of the loan, after excluding the value of the mortgaged or pledged property for other loans;

+ At least 20% equity capital participating in an investment project, after deducting the equity amount arranged for other projects;

+ At the time of request for guarantee, there are no outstanding debts to the state budget, bad debts at credit institutions or other economic organizations.

  • Land and water surface rental:

+ To enjoy exemption or reduction of land and water surface rental according to the provisions of the land law;

+ In case a special project or large scale project that brings socio-economic efficiency, which is in need of higher support than the specified support as above, the Ministry of Finance shall coordinate with the Ministry of Planning and Investment to submit to the Prime Minister. The Prime Minister makes a decision on the basis of the proposal of the Provincial People's Committee where the land is located in accordance with the land law.

7. Subjects of incentives, Procedures to confirm incentives and other regulations

This is detailed in the Government's Decree No. 111/2015 / ND-CP dated November 3, 2015.

VI . Incentives for science and technology enterprises.

1. Corporate income tax (Decree No. 80/2007 / ND-CP dated May 19, 2007 of the Government regulating science and technology enterprises and Consolidated Document No. 03 / VBHN-BKHCN dated January 06 ,2015 guiding the implementation of Decree No. 80/2007 / ND-CP)

  • Scientific and technological enterprises are entitled to the corporate income tax rate of 10% for 15 years from the first year that science and technology enterprises have revenues from science and technology activities;
  • Science and technology enterprises are exempted from corporate income tax for 04 years and 50% reduction of payable tax amounts for the next 9 years from the first year that science and technology enterprises have taxable income.

2. Condition for certification as a scientific enterprise and other incentives

It is detailed in the Government's Decree No. 80/2007 / ND-CP dated May 19, 2007 on science and technology enterprises and the Consolidated Document No. 03 / VBHN-BKHCN dated January 6, 2015 guiding the implementation of Decree No. 80/2007 / ND-CP.

VII. Incentives for high-tech enterprises; enterprises manufacturing products on the List of high-tech products encouraged for development; high-tech agricultural enterprises; hi-tech application enterprises on the list of high technologies given priority for investment and development; (Law on High Technology No. 21/2008 / QH12 dated November 13, 2008)

1. Incentive policy

• Enjoy the highest incentives in accordance with the laws on land, corporate income tax; value added tax, export and import tax;

• To be considered for the support of training, research and development and trial production funds from the National High-Tech Development Program's funding.

2. Condition for certification as a high-tech enterprise and other incentives

It is detailed in the Law on High Technology No. 21/2008 / QH12 dated November 13, 2008.

Vietnam - Singapore Industrial Park (VSIP) Industrial ParksBài viếtVietnam - Singapore Industrial Park (VSIP) /Style Library/LacViet/CMS2013/Images/newsdefault.jpg
12/10/2016 1:00 PMNoĐã ban hành
INTRODUCTION
 
Established in 1996 on the basis of cooperation and support between the two governments of Vietnam and Singapore, Vietnam Singapore Industrial Park (VSIP) is the joint venture between Becamex IDC Corporation and a Singapore consortium led by Sembcorp Development. On 14 May 1996, former Vietnamese Prime Minister Vo Van Kiet and his contemporary Singaporean counterpart Goh Chok Tong gathered at the project site in Binh Duong to attend the groundbreaking ceremony of VSIP I with 500ha. For the past 16 years of development, VSIP I has become one of the leading industrial park in Vietnam, and has proven to be a very attractive investment destination, technology transfer and environment protection for many multinational companies for the domestic as well as export markets.
 
Some 240 investors from 22 countries around the world have chosen to base their long-term investment projects in VSIP I Binh Duong. And the business of VSIP has grown from strength to strength. VSIP II Binh Duong, officially launched in 2006 with the area of 345ha in Phase 1, has attracted 128 customers so far. The on-going project, and also the most significant project of VSIP at present which has expanded the scope of work of VSIP to both industrial park and township development, is VSIP II Binh Duong Township and Industrial Park (VSIP II Binh Duong - Phase 2). Comprising a 1,000ha industrial zone and a 700ha township, VSIP is well-placed to participate in the exciting emergence of the second largest city in southern Vietnam, the New Binh Duong City.
 
Not just limited in the total area of 2,545ha in the south, since 2007, after 10 years of operation, VSIP has announced its expansion to the north with two projects: VSIP Bac Ninh Township and Industrial Park Complex of 700ha (200ha for Township and 500ha for IP); and VSIP Hai Phong Township and Industrial Park Complex of 1,600ha (1,100ha for Township and 500ha for IP).
 
The fifth VSIP Quang Ngai offers investors another option for location in central Vietnam. The VSIP Quang Ngai comprises a 600-hectare industrial park located within the Dung Quat Special Economic Zone. Separately, a 520-hectare site zoned for commercial and residential purposes will be developed near downtown Quang Ngai city. To kick-start the project, the VSIP JV will focus on a start-up area of 160 hectares for industrial park and 100 hectares for commercial and residential development.
 
With the latest project in Quang Ngai, VSIP has totally developed five industrial parks and township complexes in Vietnam with the combined area of more than 6,000ha; attracting a huge amount of investment capital flowing into the areas and generating jobs for around 110,000 employees.
 
TOTAL AREA
 
  • In the South:
    • VSIP I – Binh Duong:     500 Ha
    • VSIP II – Binh Duong:    345 Ha in Phase 1 and 1,700 Ha in Phase 2.
  • In the North:
    • VSIP Bac Ninh:                         700 Ha
    • VSIP Hai Phong:                       1,600 Ha
  • In the Central:
    • VSIP Quang Ngai:                     1,120 Ha
Main shareholders:
 
·         Becamex IDC, 49%
·         Sembcorp Development Ltd, 40.44%
·         Ascendas Investment Pte Ltd, 4.26%
·         UOL Overseas Investments Pte Ltd, 2.67%
·         MC Development Asia Pte Ltd, 1.89%
·         KMP Vietnam Investment Pte Ltd, 1.74%
 
Features:
 
  • Strategic location
  • Conducive business environment: world-class infrastructure, sewage treatment plant, power plant, etc.
  • One-stop service: management board, customs yard on site and other amenities
  • Skilled labor
  • Dedicated customer service
Key industry sectors:
 
  • Precision engineering & automotive component
  • Electrical & electronics
  • Pharmaceutical & Healthcare
  • Food & Beverage
  • Supporting industries & others
VSIP’s projects:
 
            VSIP I Binh Duong
  • Established: 1996
  • Area: 500 Ha (100% occupied)
  • Total investment capital: more than US$2 billion
  • Customers: 240 companies from 22 countries
  • Workforce: 78,838 workers    
            VSIP II Binh Duong
·           VSIP II Binh Duong (Phase 1)
    • Established: 2006
    • Area: 345 Ha (98% occupied)
    • Total investment capital: US$1.3 billion
    • Customers: 128 companies
    • Workforce: 23,800 workers
·         VSIP II Binh Duong (Phase 2)
    • Established: 2008
    • Area: 1,700 Ha comprising 1,000 Ha industrial zone and 700 Ha township
    • Expected investment capital: US$2 billion
    • Expected workforce: 40,000 workers   
·         VSIP Bac Ninh
    • Established: 2007
    • Area: 700 Ha comprising 500 Ha industrial zone and 200 Ha township
    • Expected investment capital: US$2 billion
    • Expected workforce: 35,000 workers   
·         VSIP Hai Phong
    • Established: 2010
    • Area: 1,600 Ha comprising 500 Ha industrial zone and 1,100 Ha township
·         VSIP Quang Ngai
    • Investment Certificate Granting: 23/4/2012
    • Area: 1,120 Ha comprising 600 Ha industrial zone and 520 Ha township
HEAD OFFICE
 
Vietnam Singapore Industrial Park
 
No. 8 Huu Nghi ave, VSIP Building, Thuan An town, Binh Duong province, Vietnam.
Tel: (+84) 274 3743 898 Fax: (+84) 274 3743 430.
Viet Huong Industrial ParkIndustrial ParksBài viếtViet Huong Industrial Park/Style Library/LacViet/CMS2013/Images/newsdefault.jpg
12/10/2016 12:00 PMNoĐã ban hành
1.     INFORMATION ON INVESTOR
 
-       Investor: Viet Huong Joint Stock Company.
-       Address: The 11th kilometer, Binh Duong avenue, Thuan An town, Binh Duong province, Vietnam.
-       Phone: (+84) 274 3 755 980. Fax: (+84) 274 3 754 989.
-       Website: www.viethuongip.com
-       E-mail: vhip@hcm.vnn.vn
       -    Investment/business registration certification: Certification of business registration and tax registration No. 3700147405 issued by Binh Duong Department of Planning and Investment dated Oct 26, 1995; the 11th change dated Dec 08, 2009.
        -       Fields of business registration: construction, investment and industrial infrastructure trading.
 
2.     INFORMATION ON THE INDUSTRIAL PARK
 
- Investment certification: Investment certification No. 02/GPĐTTN of the Ministry of Planning and Investment dated Nov 25, 1996; the first adjustment: Investment certification No. 02/GPĐTTN- ĐC1 dated Aug 15, 1998 on adjusting to expand the industrial park.
 
- Decision on approving the detail plan of the industrial park: Decision No. 161/BXD-KTQH of the Ministry of Construction dated Apr 05, 1997.
 
3.     LAND USE STRUCTURE
 
Type of land
Area (ha)
Percentage (%)
Land for constructing plants
25.0683
69.51
Land for constructing public service works
2.3935
6.64
Land for technical infrastructure
0.6018
1.67
Land for trees
2.9160
8.08
Land for traffic
5.0844
14.10
Total
36.064
100
 
-       Address: The 11th kilometer, Binh Duong avenue, Thuan An town, Binh Duong province, Vietnam.
-       Location: 18km away from Tan Son Nhat International Airport; about 16km away from The New Port; about 10km away from Song Than Station; about 20km away from the center of Ho Chi Minh City; 5km away from Thu Dau Mot City.
-       Total investment capital: VND 56.4 billion.
-       Industrial land area for rent: 25.07 hectare.
-       Technology infrastructure: completed.
-       Sewage treatment plant: the capacity of 1000 m3/day.
-       Year started operations: 1996.
-       Total implementation capital: 49.57 billion.
-       Land area for rent: 25.07 hectare, account for 100%.​

-      Decision No.842/QD-MTg dated April 7, 1997 by the Ministry of Natural Resources and Environment on the approval of the EIA report

4. SCOPES OPERATION

-Textile, garment, footwear;

-Fire art and handicraft items;

-Manufacture of household appliances;

-Manufacture of toys;

-Assembly of electronic products


Thoi Hoa Industrial ParkIndustrial ParksThoi Hoa Industrial Park/Style Library/LacViet/CMS2013/Images/newsdefault.jpg
12/10/2016 12:00 PMNoĐã ban hành
1.     INFORMATION ON INVESTOR
 
-       Investor: Investment and Industrial Development Corporation (BECAMEX IDC CORP.)
-       Address: 230 Binh Duong avenue, Thu Dau Mot city, Binh Duong province, Vietnam.
-       Phone: (+84) 274 3 822 655 – (+84) 274 3 811 777.
-       Fax: (+84) 274 3 822 713 – (+84) 274 3 811 666.
-       Website: www.becamex.com.vn
-       E-mail: vninvest@becamex.vn 
 
          Fields of business registration: investment and construction of industrial, residential, urban and transportation infrastructure; securities, finance, insurance, banking, construction, trading, real estate, services, telecommunication – information technology, construction materials, mining, pharmaceutical, healthcare and education.
 
2.     INFORMATION ON THE INDUSTRIAL PARK
 
- Decision on the establishment: Decision No. 1717/CP-CN of the Prime Minister dated Nov 17, 2004 on advocating to construct industrial parks in Binh Duong province.
 
- Decision on approving the detail plan of the industrial park: Decision No. 2203/BXD-KTQH of the Ministry of Construction dated Oct 27, 2005 on reaching the detail plan of Thoi Hoa industrial park, Binh Duong province; Decision No. 4600/UBND-KTTH of Binh Duong People’s Committee dated Oct 12, 2007 on adjusting the detail plan of Thoi Hoa industrial park, Ben Cat District.
 
3.     LAND USE STRUCTURE
 
Type of land
Area (ha)
Percentage (%)
Land for constructing plants
12450
61.511
Land for warehouses
10.09
4.985
Land for constructing public service works
5.45
2.693
Land for technical infrastructure
3.92
13.488
Land for trees and lakes
27.30
1.937
Land for traffic
27.62
13.646
Expanded land
3.5233
1.741
Total
202.40
100.00
 
-       Address: Thoi Hoa commune, Ben Cat district, Binh Duong province, Vietnam.
-       Total investment capital: VND 339.442 billion.
-       Industrial land for rent: 134.59 hectare.
-       Technical infrastructure: being constructed.
-       Total implementation capital: VND 179.496 billion​

        -      Decision No.1697/QD-BTNMT dated November 15, 2006 by the Ministry of Natural Resources and Environment on the approval of the EIA report

4. SCOPES OPERATION

-Apparel (without textile, dyeing), footwear-leather (without tanning), manufacture of paper packaging products (not including paper powder)

-Electronics, electricity and machinery;

-Manufacture of building materials, pottery items, household wooden products, household appliances, office groceries;

-Processing of forestry-fishery products

Tan Dong Hiep B Industrial ParkIndustrial ParksBài viếtTan Dong Hiep B Industrial Park/Style Library/LacViet/CMS2013/Images/newsdefault.jpg
12/10/2016 12:00 PMNoĐã ban hành
1.     INFORMATION ON INVESTOR
 
-       Investor: Phu My Limited Company
-       Address: Tan Dong Hiep B Industrial Park – Tan Dong Hiep ward, Di An town, Binh Duong province, Vietnam.
-      Tel: (+84) 274 3 791 989. 
 
2.      INFORMATION ON THE INDUSTRIAL PARK
 
- Decision on the establishment: Decision No. 327/TTg of the Prime Minister dated May 02, 2002 on transferring the zone B with area of 164.12 hectare from Binh Duong Manufacturing Import and Export Company to Tu Hai Limited Company for construction and infrastructure trading.
 
- Decision on approving detail plan of industrial park: Decision No.1298/ QĐ/KTQH of the Ministry of Construction dated July 04, 2005 on adjusting the detail plan of Tan Dong Hiep B industrial park, Binh Duong province. According to this decision, there was a fall of 1.2 hectare land for the technical infrastructure.
 
3.     LAND USE STRUCTURE
 
Type of land
Area (ha)
Percentage (%)
Land for constructing plants
103.07
63.26
Land for warehouses
8.71
5.35
Land for public service works
1.70
1.04
Land for technical infrastructure
5.75
3.53
Land for trees
23.69
14.54
Land for traffic
20.00
12.28
Total
162.92
100.00
 
-       Address: Tan Dong Hiep ward, Di An town, Binh Duong province, Vietnam.
-       Location: 19 km away from Tan Son Nhat International Airport; 20km away from Sai Gon Port; 2.5km away from Song Than Station; 18km away from Ho Chi Minh City.
-       Total investment capital: VND 302.406 billion.
-       Industrial land for rent: 103 hectare.
-       Technical infrastructure: being completed.
-       Sewage treatment plant: the capacity of 2500m3/day.
-       Year Started operations: 2001.
-       Total implementation capital: VND 170.127 billion.
-       Land area for rent: 80 hectare, accounted for 78%.​

-     Decision No.114/QD-BTNMT dated January 28, 2003 by the Ministry of Natural Resources and Environment on the approval of the EIA report
4. SCOPES OPERATION

        -Manufacture of machines, industrial and household electrical appliances;

-Electronics, informatics, telecommunications;

-Light industries of toys, artificial jewelry products, pottery items and glass wares;

-Warehouses

-Food processing

-Manufacture and assembly of watches, clocks, optical devices;

-Processing of fire-art wooden products for export, manufacture of office groceries, home decoration items;

-Manufacture of plastic, metal products and household appliances


Tan Dong Hiep A Industrial ParkIndustrial ParksTan Dong Hiep A Industrial Park/Style Library/LacViet/CMS2013/Images/newsdefault.jpg
12/10/2016 12:00 PMNoĐã ban hành
1. INFORMATION ON INVESTOR
 
-       Investor: The Dapark Construction and Real Estate Trading Joint-Stock Corp.
-       Address: 62-64 Le Thi Rieng Street, District 1, Ho Chi Minh City.
-       Phone: (+84) 28 3 832 2793. Fax: (+84) 28 3 839 1606.
-       Website: www.dasogroup.vn
 

      2. INFORMATION ON THE INDUSTRIAL PARK

 
-       Decision on the establishment: Decision No. 1282/QĐ-TTg dated Dec 19, 2000 of the Prime Minister on transferring the zone A with area of 47.01 hectare from Binh Duong Manufacturing Import Export Company to the Dapark Construction and Real Estate Trading Joint-Stock Corp. for construction and infrastructure trading of the zone A, Tan Dong Hiep industrial park, Binh Duong province.
 
-       Decision on approving detail plan of the industrial park: Decision No.396/BXD/KTQH of the Minister of Construction dated Sep 03, 1997 on approving detail plan of Tan Dong Hiep industrial park, Binh Duong province; Decision No. 4770/QĐ-UBND of Binh Duong People’s Committee dated Oct 24, 2006 on adjusting detail plan Tan Dong Hiep industrial park, Binh Duong.
 
  1. LAND USE STRUCTURE
 
Type of land
Area (ha)
Percentage (%)
Land for constructing plants
37.4160
70.75
Land for constructing public service works
1.7250
3.26
Land for technical infrastructure
0.3280
0.62
Land for trees
7.8660
14.87
Land for traffic
5.5513
10.50
Total
52.8630
100.00
 
-       Address: Tan Dong Hiep, Tan Binh and Dong Hoa ward, Di An town, Binh Duong province, Vietnam..
-       Location: 23km away from Tan Son Nhat International Airport; 18km away from the New Port; 21km away from Ben Nghe; 04km away from Song Than Station; 19km away from Ho Chi Minh City.
-       Total investment capital: VND 73.23 billion.
-       Industrial land for rent: 37.42 hectare.
-       Technical infrastructure: completed.
-       Sewage treatment plant: capacity: 700 m3/day.
-       Year stated operations: year 2002.
-       Total implementation capital: VND 62.904 billion
-       Land area for rent: 37.42 hectare, accounted for 100%.​

-     Decision No.1063/QD-BTNMT dated August 12, 2003 by the Ministry of Natural Resources and Environment on the approval of the EIA report
4. SCOPES OPERATION

-Manufacture of machines, industrial and household electrical appliances;

-Electronics, informatics, telecommunications;

-Light industries of toys, artificial jewelry products, pottery items and glass wares;

-Warehouses

-Food processing

-Manufacture and assembly of, clocks, optical devices;

-Processing of fire-art wooden products for export, manufacture of office groceries, home decoration items;

-Manufacture of plastic, metal products and household appliances


Song Than 3 Industrial ParkIndustrial ParksBài viếtSong Than 3 Industrial Park/Style Library/LacViet/CMS2013/Images/newsdefault.jpg
12/10/2016 12:00 PMNoĐã ban hành
1.INFORMATION ON INVESTOR
 
-     Investor: Dai Nam Joint Stock Company
-     Address: 1765 Binh Duong boulevard, Hiep An ward, Thu Dau Mot city, Binh Duong province, Vietnam
-     Tel: (+84) 274 3 845 845 – (+84) 274 3 845 878 – (+84) 274 3 829 605.
-     Fax: (+84) 274 3 512 391 – (+84) 274 3 845 804 – (+84) 274 3 821 734.
-     Website: www.laccanhdainamvanhien.vn
-     E-mail: hd.group@hcm.vnn.vn
-     Investment Certificate: No. 3700147268 first registered on 27 March 1996, issued by Investment and Planning Department of Binh Duong, amended the 34th on 24 August 2010.
-     Registered business: Operating travel park, real estates business, factories leasing, business in industrial park infrastructure, residential and urban areas, etc.
 
2.INFORMATION ON INDUSTRIAL PARK
 
-     Decision of establishment: Document no. 912/TTg of Prime Minister dated 1 Sep 2005 on the Master Plan of Binh Duong Industry – Service – Urban Complex; No. 3505/QD-UBND dated 1 August 2008 of Binh Duong People’s Committee on the establishment and approval of mater plan for infrastructure investment of Song Than 3 Industrial Park.
-     Investment Certificate: no. 46221000224 dated 6 August 2007 issued by Binh Duong Industrial Zone Management Board.
-     Decision on master plan of the industrial park: no. 2940/QD-CT dated 22 June 2006 of Chairman of Binh Duong People’s Committee on approving the master plan of Song Than 3 Industrial Park, Binh Duong Industry – Service – Urban Complex.
 
3.LAND USE STRUCTURE
 
Type of land
Area (ha)
Percentage (%)
Land for industrial factory construction
319.792
59.90
Land for warehouses
7.616
1.43
Land for administration – service
2.282
0.43
Land for trees planting
54.789
10.26
Land for central infrastructure works construction
7.242
1.36
Land for transportation work construction
80.634
15.10
Land for Residential area
61.490
11.52
TOTAL
533.846
100.00
 
 
-       Address: Binh Duong Industrial Service and Residential Complex, Phu Tan ward, Thu Dau Mot city, Binh Duong province, Vietnam.
-       Total investment capital: VND 935.945 billion.
-       Industrial land area for rent: 327 hectare.
-       Technical infrastructure: being completed.
-       Sewage treatment plant: the capacity of 4000m3/day.
-       Year started operations: year 2008.
-       Total implementation capital: VND 839.879 billion
-       Land area for rent: 220 hectare, accounted for 67%.​

-     Decision No.743/QD-UBND dated August 2, 2007 by Binh Duong provincial People’s Committee on the approval of the EIA report
4. SCOPES OPERATION

-     Food and foodstuff processing;

-     Manufacture of pharmaceutical and cosmetic products;

-     Manufacture of consumer goods, household appliances, packaging products (paper, plastic, aluminum, steel), woodwork processing, printing, extraction of gas and plant growth substances;

-     Manufacture and assembly of electronic-electrical equipment, bicycles and their components;

-      Agricultural machines;

-      Building materials;

-      Fine-art handicrafts, services.


Song Than 2 Industrial ParkIndustrial ParksBài viếtSong Than 2 Industrial Park/Style Library/LacViet/CMS2013/Images/newsdefault.jpg
12/10/2016 12:00 PMNoĐã ban hành
1. INFORMATION ON INVESTOR
 
-     Investor: Dai Nam Joint Stock Company
-     Address: 1765 Binh Duong boulevard, Hiep An ward, Thu Dau Mot city, Binh Duong province, Vietnam
-     Tel: (+84) 274 3 845 845 – (+84) 274 3 845 878 – (+84) 274 3 829 605.
-     Fax: (+84) 274 3 512 391 – (+84) 274 3 845 804 – (+84) 274 3 821 734.
-     Website: www.laccanhdainamvanhien.vn
-     E-mail: hd.group@hcm.vnn.vn
-     Investment Certificate: No. 3700147268 first registered on 27 March 1996, issued by Investment and Planning Department of Binh Duong, amended the 34th on 24 August 2010.
-     Registered business: Operating travel park, real estates business, factories leasing, business in industrial park infrastructure, residential and urban areas, etc.
 
2. INFORMATION ON INDUSTRIAL PARK
 
-     Decision of establishment: Document no. 796/TTg of Prime Minister dated 26 Oct 1996 on the investment project for construction and business of infrastructure for Song Than 2 Industrial Park, Song Be Province.
-     Decision on master plan of the industrial park: Decision no. 1199/QD-BXD dated 24 Sep 2002 of Minister of Construction on amending the master plan of Song Than 1 & 2 Industrial Park, Binh Duong Province; no. 958/QD-UBND issued by Binh Duong People’s Committee dated 31 March 2008 on amending the master plan of Song Than 2 Industrial Park, Binh Duong Province.
 
3. LAND USE STRUCTURE
 
Type of land
Area (ha)
Percentage (%)
Land for industrial factory construction
194.74
69.73
Land for service management work construction
22.85
8.18
Land for trees planting
27.70
9.92
Land for central infrastructure works construction
0.55
0.20
Land for transportation works
32.87
11.77
Land for other purposes
0.56
0.20
TOTAL
279.27
100.00
 
-     Address: Di An ward & Tan Dong Hiep ward, Di An town, Binh Duong province, Vietnam.
-     Geographic location: Sai Gon Port: 12km. ICD Song Than Port: 01km, Tan Cang: 9.5km; Sai Gon Port: 14km; Ho Chi Minh City: 15km.
-     Total investment capital: 423.28 billion VND.
-     Total industrial land for leasing: 217.59 hectares.
-     Infrastructure: ready.
-     Waste water treatment factory: with the capacity of 4,000 m3 per day.
-     Year of operation: year 1996.
-     Implemented capital: 375.557 billion VND.
-     Rental land area: 209.98 hectares. fulfill 96.5%.​

      -     Decision No.73/QD-MTg dated November 1, 1997 by the Ministry of Science-Technology and Environment on the approval of the EIA report

4. SCOPES OPERATION
      -  Textile, garment, footwear;

- Household electrical appliances;

-  Fine-art handicrafts from bamboo, rattan and furniture products;

-  Building materials;

-  Food and foodstuff processing

-  Glass wares, pottery items;

- Power plants with capacity of 75MW


Song Than 1 Industrial ParkIndustrial ParksBài viếtSong Than 1 Industrial Park/Style Library/LacViet/CMS2013/Images/newsdefault.jpg
12/10/2016 12:00 PMNoĐã ban hành
1. INFORMATION ON INVESTOR:
 
-     Investor: Thanh Le Import Export – Trading General Company – One member limited liability.
-     Address: 63 Yersin street, Hiep Thanh ward, Thu Dau Mot city, Binh Duong province, Vietnam.
-     Tel: (+84) 274 3 829 535. Fax: (+84) 274 3 824 112.
-     Website: www.thalexim.com 
-     E-mail: thalexim@hcm.vnn
-     Investment Certificate: No. 3700146458 issued by Investment and Planning Department of Binh Duong on 1 July 2010 (transferred from Thanh Le Import Export – Trading Private Company no. 4606000006 dated 23 Oct 1992)
-     Registered business: Construction and business in industrial park infrastructure, residential and urban areas, worker houses; real estates business, leasing office, conference rooms, seminars organizing, leasing warehouse, factories; import export petrol; trading petrol materials; construction of industrial and civil works, infrastructure, etc.
 
2. INFORMATION ON INDUSTRIAL PARK
 
-     Decision of establishment: Document no. 577/TTg of Prime Minister dated 16 Sep 1995
-     Decision on master plan of the industrial park: no. 1444/QD-UBND issued by Binh Duong People’s Committee dated 12 May 2008 on amending some items in the master plan of Song Than 1 Industrial Park at Decision no. 1199/QD-BXD dated 24 Sep 2002 of Minister of Construction.
 
3. LAND USE STRUCTURE
 
Type of land
Area (ha)
Percentage (%)
Land for industrial factory construction
112.51
62.40
Land for service management work construction
27.20
15.00
Land for trees planting & ponds
12.20
8.10
Land for central infrastructure works construction
4.69
2.60
Land for transportation works
0.75
0.40
TOTAL
178.01
100
 
-     Address: Di An ward, Di An town, Binh Duong province, Vietnam.
-     Geographic location: Sai Gon Port and Tan Cang: 12km, Vung Tau Port: 12km; Tan Son Nhat Airport: 15km; next to South-East Railways in the East, near Song Than Railway station; Near the Center of Ho Chi Minh City; Bien Hoa City: 15km; Vung Tau City: 100km.
-     Total investment capital: 245.1 billion VND.
-     Total industrial land for leasing: 139.71 hectares. Land for service: 12.038 hectares.
-     Industrial park’s field of attraction: manufacturing in machines, equipments, light industry (textiles, footwear, furniture, etc.), food and drink industry, construction materials, electronics, etc.
-     Infrastructure: ready.
-     Waste water treatment factory: with the capacity of 8,400 m3 per day.
-     Year of operation: year 1995.
-     Implemented capital: 195.527 billion VND.
-     Rental land area: 139.71 hectares. Fulfill 100%.​

      -     Decision No.352/QD-MTg dated March 29, 1997 by the Ministry of Science-Technology and Environment on the approval of the EIA report
4. SCOPES OF OPERATION

-Manufacture of machines, equipment; assembly and manufacture of transport vehicles, machines in construction;

-Processing of agro-forestry products;

-Light industries (including apparel, electricity and electronics)


Rach Bap Industrial ParkIndustrial ParksBài viếtRach Bap Industrial Park/Style Library/LacViet/CMS2013/Images/newsdefault.jpg
12/10/2016 12:00 PMNoĐã ban hành
1. INFORMATION ON INVESTOR
 
-     Investor: Dau Tieng Rubber One Member Company Limited
-     Address: Dau Tieng bourg, Dau Tieng district, Binh Duong province, Vietnam.
-     Tel: (+84) 274 3 578 963. Fax: (+84) 274 3 578 964.
-     Website: www.rachbapip.com
-     E-mail: investment@rachbapip.com
 
2. INFORMATION ON INDUSTRIAL PARK
 
-     Decision of establishment: Document no. 1838/TTg-CN of Prime Minister dated 16 Nov 2005 on approving the investment and construction of Rach Bap Industrial Park, Binh Duong Province.
-     Decision on master plan of the industrial park: No. 346/QD-BXD of Ministry of Construction dated 3 March 2006 on the master plan of Rach Bap Industrial Park, Binh Duong; no. 3962/QD-UBND issued by Binh Duong People’s Committee dated 13 Dec 2010 on amending the master plan of Rach Bap Industrial Park, Binh Duong Province.
 
3. LAND USE STRUCTURE
 
Type of land
Area (ha)
Percentage (%)
Land for industrial factory construction
189.528511
68.03
Land for service management work construction
5.019960
1.80
Land for central infrastructure works construction
6.264876
2.25
Land for trees planting
38.394371
13.78
Land for transportation works
39.395522
14.14
TOTAL
278.603240
100
 
-     Address: An Dien commune, Ben Cat district, Binh Duong province, Vietnam.
-     Geographic location: Tan Son Nhat Airport, Sai Gon Port, Center of Ho Chi Minh City: 55km; Thu Dau Mot City, Binh Duong: 20 Km; Vinaconex Port of Import Export General Company (Ministry of Construction): 3km.
-     Total investment capital: 196.014 billion VND.
-     Total industrial land for leasing: 188 hectares.
-     Infrastructure: Under finishing.
-     Waste water treatment factory: with the designed capacity of 3,000 m3 per day.
-     Year of operation: year 2008.
-     Implemented investment capital: 142.378 billion VND.
-     Rental land area: 9 hectares. Fulfill 5%.​

      -     Decision No.1446/QD-BTNMT dated October 22, 2004 by the Ministry of Natural Resources and Environment on the approval of the EIA report
4. SCOPES OF OPERATION

-Processing of agro-forestry products, especially ones from rubber;

-Apparel;

-Manufacture of fine-art wooden items for export, office groceries;

-Light industries of toys, textile (without dyeing), leather-footwear (without tanning)

-Manufacture of machines, electrical equipment and components;

-Manufacture and repair of machines in construction;

-Manufacture of household plastic products.


Nam Tan Uyen Industrial Park Industrial ParksBài viếtNam Tan Uyen Industrial Park /Style Library/LacViet/CMS2013/Images/newsdefault.jpg
12/10/2016 12:00 PMNoĐã ban hành
1.     INVESTOR INFORMATION
 
-    Investor: Nam Tan Uyen Industrial Park joint Stock Company
-     Address: Hamlet 4, Khanh Binh commune, Tan Uyen district, Binh Duong province
-    Tel: (0274) 3 652 326 – (0274) 3 652 330
-    Fax: (274) 3 652 325 – (0274) 3 652 327
-    E-mail: namtanuyen@vmm.vn
Investment/ business license No. 4603000142 issued on June 14th, 2010 (the 6th amended) by Binh Duong Department of Planning and Investment.
-    Registered business: IP infrastructure investment and construction; civil, industrial, hydraulic, transport, bridge and road construction; land leveling, housing business, renting office, warehouse, workshop, ports; restaurant and hotels; waste, waste water collection and treatment; waste water sample analyses.
 
2.   INFORMATION ON INDUSTRIAL PARK
 
 
-    Decision No. 1717/TTg-CN dated November17th, 2004 of the Prime Minister.
-    Investment certificate: Decision No.5297/QD-UBND dated October 24th, 2005 of Binh Duong People’s Committee on establishing and approving the investment construction and technical infrastructure business project of Nam Tan Uyen IP in Binh Duong province.
 
-    Decision of Master plan No. 2169/QD-BXD dated November 22nd, 2005 of Ministry of Construction; Decision No. 1308/ QD-UBND dated May 06th, 2010 on approving the amendment of the detail plan at the rate 1/2000 of Nam Tan Uyen IP in Tan Uyen district, Binh Duong province.
 
 
3.   USING LAND STRUCTURE
         
Type of land
Area (ha)
Percentage (%)
Land for industrial factory
204.26
61.80
Land for public service center
18.15
5.49
Land for technical infrastructure center
6.30
1.91
Land for green space
48.15
14.57
Land for transport
53.65
16.23
Total
330.51
100
 
-    IP Address: Hamlet 4, Khanh Binh commune, Tan Uyen district, Binh Duong province, Vietnam.
-     Location on the axe of road DT 746 and DT 747 with the cross section of 38 meters for 06 vehicle lands; 30km from Cat Lai port, 16 km from Song Than port, 06km from Thanh Phuoc river port, 28 km from Ho Chi Minh City, 32km from Tan Son Nhat airport, 13km from national Highway 13, 06km from Binh Duong new
-      Total capital: 335
-     billion VND
-       Industrial land for rent: 655.59 ha
-       Technical infrastructure: completed
-       Waste water plant: capacity 16,000 m3 per day
-       Operation time : 2007
-       Total implemented capital: 1,107.331 billion VND
-       Renting area: 333.23 ha; occupancy rate: 50.82%

- Decision No.974/QD-BTNMT dated Apr 8, 2004 by Ministry of Natural Resources and Environment on the approval of the EIA report

4. SCOPES OF OPERATION

+ Processing of agricultural products, production of cattle and poultry food;

 + Processing industries serving agricultural development, mechanical engineering, farm machinery and equipment, fertilizers, rubber products;

 + Production of consumer goods for domestic trade and export, such as garments, wood processing, household appliances, plastic products, all kinds of packaging;

 + Production of building materials, such as mining of kaolin, production of ceramic tiles, interior decoration materials, structural frames, roofing, cover sheets.

 
*  NAM TAN UYEN EXTENDED IP INFORMATION
 
-       Decision No. 1285/TTg-KCN dated July 29th, 2009 of the Prime Ministeron establishment the Nam Tan Uyen extended IP.
-       Decision of Master plan No. 1307/QD-BXD dated May 06th, 2010 of Binh Duong People’s Committee on approving the amendment of the detail plan at the rate 1/2000 of Nam Tan Uyen IP in Tan Uyen district, Binh Duong province.
-       IP Address: Hoi Nghia bourg, Tan Uyen district, Binh Duong province, Vietnam.
-       Geographic location on the axe of road DT 746 and DT 747 with the cross section of 38 meters for 06 vehicle lands; 32km from Cat Lai port, 18 km from Song Than ICD port, 08 km from Thanh Phuoc river port, 30 km from Ho Chi Minh City, 34km from Tan Son Nhat airport, 19 km from Song Than railway station, 08 km from Binh Duong new.
-       Total capital: 491 billion VND.
-       Industrial land for rent: 200.75 ha, service land: 8.8 ha.
-       Technical infrastructure: constructing.
-       Waste water plant: constructing.
-       Renting area: 8.6 ha; occupancy rate: 4.3%.
-       Renting land price (reference): 36-42 USD/ m2 excluding management fee.​

- Decision No.2118/QD-BTNMT dated Sep 11, 2010 by Ministry of Natural Resources and Environment on the approval of the EIA report

SCOPES OF OPERATION

+ Mechanical projects: metallurgy, production of tools, spare parts, equipment; production of equipment, machinery serving agricultural and industrial production; manufacture of automobiles and motorcycles; outsource and assembly of special machinery and equipment; casting, rolling and drawing of metals;

   + Projects of food processing and beverages: processing of vegetables, fruits, grains and other agricultural products; processing of dairy, cattle and poultry products; processing of aquatic and seafood; industrial catering; confectioneries; all kinds of snack food, beer, soft drinks, and all kinds of pure water;

   + Projects of building materials: concrete structures, drains, artificial drain for foundation treatment; baked tunnel bricks; marble, granite, pigment;

   + Projects of pharmaceuticals, cosmetics: production of cosmetics; drugs for people and poultry (including oriental and new medicines); production and processing of biological products;

   + Projects of textiles (un-dyed) and garments: manufacture of garments, leathers (not tanning), faux leather, manufacture of textiles (un-dyed);

  + Other projects: assembly of electronic products, printing, packaging and related services; production of handicrafts, wood processing and wood products; production of metal structures, tanks, reservoirs and boilers; production of plastics, domestic and high-end aluminum products; production of paper and packaging from pulp or used papers; production of technological products; production of children's toys; support services for operations of industrial parks such as office rental, banking, postal, telecommunications, storage (including cold storage), warehouse, transportation, delivery, catering, commercial cleaning, collection and transportation of solid wastes, hazardous wastes to thorough treatment places outside the industrial parks.



My Phuoc 3 Industrial ParkIndustrial ParksBài viếtMy Phuoc 3 Industrial Park/Style Library/LacViet/CMS2013/Images/newsdefault.jpg
12/10/2016 12:00 PMNoĐã ban hành
1.     INVESTOR INFORMATION
 
-    Investor: Investment and Industrial Development Corporation (Becamex IDC Corp.)
-     Address: 230 Binh Duong avenue, Thu Dau Mot city, Binh Duong province, Vietnam.
-    Tel: (+84) 274 3 822 655 – (+84) 274 3 811 777.
-    Fax: (+84) 274 3 822 713 – (+84) 274 3 811 666
-    Website: www.becamex.com.vn
-    E-mail: vninvest@becamex.vn 
-    Registered business: IP, Residential and urban zones, transport infrastructure investment and construction; securities, finance, insurance, bank, construction, trade, real estate, service, telecommunication – information technology, beton production, construction materials, mine exploitation, pharmacy, medical service and education.
 
2.   INFORMATION ON INDUSTRIAL PARK
 
-    Decision No. 1316/TTg-CN dated August 28th, 2006 of the Prime Minister on establishment of My Phuoc 3 IP in Binh Duong province, Decision No. 3920/QD_UBND dated August 31st, 20006 of Binh Duong People’s Committee Chairman on establishing and approving the investment construction and technical infrastructure business project of My Phuoc 3 IP in Binh Duong province.
 
-    Decision of Master plan No. 1308/QD-BXD dated September 18th, 2006 of Ministry of Construction on approving the detail plan of My Phuoc 3 IP in Binh Duong province.
 
 
3.   USING LAND STRUCTURE         
 
Type of land
Area (ha)
Percentage (%)
Land for industrial factory
655.6895
67.0638
Land for public service center
42.9747
4.3954
Land for green space and lake
123.3952
12.6208
Land for technical infrastructure
20.6478
2.1119
Waste water treatment station
2.5020
0.2559
Land for transport
132.5013
13.5522
Total
997.7105
100
 
-    Address: Thoi Hoa commune and My Phuoc bourg, Ben Cat district, Binh Duong province, Vietnam.
-    Geographic location: 45 km from Ho Chi MinhCity,14km from Thu Dau Mot City, 32km from Tan Cang, Sai Gon port group, VICT; 42 km from ICD Phuoc Long, 42km from Tan Son Nhat airport.
-      Total capital: 1,219.459 billion VND.
-       Industrial land for rent: 655.59 ha.
-       Technical infrastructure: completed.
-       Waste water plant: capacity 16,000 m3 per day.
-       Operation time : year 2007.
-       Total implemented capital: 1,107.331 billion VND. Renting area: 333.23 ha; occupancy rate: 50.82%.​

- Decision approving the EIA report: S482 / QD-BTNMT dated 04/05/2007 of the Ministry of Natural Resources and Environment

4. SCOPES OF OPERATION

    - Electricity, industrial electricity and domestic electricity;

    - Electronics, information technology, media, telecommunications and television, high-technology

    - Manufacture of motorcycles, automobiles, tractors, equipment and spare parts, spare part assembly;

    - Engineering, precision engineering;

    - Spinning, weaving, garments;

    - Leathers, faux leather, leather shoes (no animal skins and hides);

    - Plastics;

    - Ceramics, glass, crystal;

    - Processing of food;

    - Processing of agricultural and forest products;

    - Production of pharmaceuticals, cosmetics, agricultural, veterinary pharmaceuticals;

    - Rubber, tires and high-tech rubber products (no processing of fresh latex);

    - Production of industrial gases;

    - Production of furniture, interior decorative items, building materials

    - Production of construction steels, steel pipes;

    - Production of sports instruments, toys, jewelry;

    - Packaging, prepress, printing, paper (no pulp);

    - Production of optical instruments, medical instruments.


My Phuoc 2 Industrial ParkIndustrial ParksBài viếtMy Phuoc 2 Industrial Park/Style Library/LacViet/CMS2013/Images/newsdefault.jpg
12/10/2016 12:00 PMNoĐã ban hành
1.     INFORMATION ON INVESTOR
 
-    Investor: Investment and Industrial Development Corporation (Becamex IDC Corp.)
-     Address: 230 Binh Duong avenue, Thu Dau Mot city, Binh Duong province, Vietnam.
-    Tel: (+84) 274 3 822 655 – (+84) 274 3 811 777.
-    Fax: (+84) 274 3 822 713 – (+84) 274 3 811 666.
-    Website: www.becamex.com.vn
-    E-mail: vninvest@becamex.vn 
-    Registered business: IP, Residential and urban zones, transport infrastructure investment and construction; securities, finance, insurance, bank, construction, trade, real estate, service, telecommunication – information technology, beton production, construction materials, mine exploitation, pharmacy, medical service and education.
 
2.   INFORMATION ON INDUSTRIAL PARK
 
-     Decision No. 59/TTg dated January 14th, 2005 of the Prime Minister on establishment of My Phuoc 2 IP in Binh Duong province; Decision No. 222/QD-CT dated January 20th, 2005 of Minh Duong People’s Committee Chairman on establishing and approving the investment construction and technical infrastructure business project of My Phuoc 2 IP.
 
-    Decisions of Master plan No. 218/QD-BXD dated March 04th, 2005 of Ministry of Construction on approving the detail plan of My Phuoc 2 IP in Binh Duong province and Decision No. 910/QD-UBND dated March 25th, 2008 of Binh Duong People’s Committee on amendment the detail plan of My Phuoc 2 IP.
 
3.   USING LAND STRUCTURE         
 
Type of land
Area (ha)
Percentage(%)
Land for factory
331.28
69.39
Land for warehouse
1.69
0.35
Land for public service center
10.60
2.22
Land for green space, canals
45.68
9.57
Lake
2.2
0.51
Waste water treatment station
1.68
0.35
Water supply station
1.69
0.35
Power station
5.33
1.12
Land for transport
68.70
14.39
Corridor land to protect the electric lines
8.33
1.74
Total
477.39
100
 
-    Address: My Phuoc bourg, Ben Cat district, Binh Duong province, Vietnam.
-    Geographic location: 45 km from Ho Chi MinhCity,14km from Thu Dau Mot City, 32km from Tan Cang, Sai Gon port group, VICT; 42 km from ICD Phuoc Long, 42km from Tan Son Nhat airport.
-      Total capital: 440.6 billion VND.
-       Industrial land for rent: 332.97 ha.
-       Technical infrastructure: completed.
-       Waste water plant: capacity 8,000 m3 per day.
-       Operation time : year 2006.
-       Total implemented capital: 446.311 billion VND.
-       Renting area: 331.28 ha; occupancy rate: 99.49%.​

- Decision No.1764/QD-BTNMT dated Sep 11, 2010 by Ministry of Natural Resources and Environment on the approval of the EIA report

4. SCOPES OF OPERATION

- Food processing industry;

    - Processing of agricultural and forest products;

    - Garments;

    - Textiles and dyeing;

    - Production of furniture;

    - Industry electronics, industrial electricity and electrical appliances;

    - Industrial machinery manufacturing mechanical construction;

    - Industrial production of pharmaceuticals, agricultural chemicals and veterinary drugs;

    - Industrial production of plastic;

    - Industry footwear;

    - Industrial Paper & Packaging (no pulp);

    - Industrial production of sports instruments;

    - Production of optical instruments, medical instruments;

    - Industrial production of construction materials.


My Phuoc Industrial ParkIndustrial ParksBài viếtMy Phuoc Industrial Park/Style Library/LacViet/CMS2013/Images/newsdefault.jpg
12/10/2016 12:00 PMNoĐã ban hành
1.     INVESTOR INFORMATION 
 
-    Investor: Investment and Industrial Development Corporation (Becamex IDC Corp.)
-     Address: 230 Binh Duong avenue, Thu Dau Mot city, Binh Duong province, Vietnam.
-    Tel: (+84) 274 3 822 655 – (+84) 274 3 811 777.
-    Fax: (+84) 274 3 822 713 – (+84) 274 3 811 666
-    Website: www.becamex.com.vn
-    E-mail: vninvest@becamex.vn 
-    Registered business: IP, Residential and urban zones, transport infrastructure investment and construction; securities, finance, insurance, bank, construction, trade, real estate, service, telecommunication – information technology, beton production, construction materials, mine exploitation, pharmacy, medical service and education.
 
2.   INFORMATION ON INDUSTRIAL PARK
 
-    Decision No. 452/TTg dated June 14th, 2002 of the Prime Minister on establishing and approving investment construction and technical infrastructure business of My Phuoc IP, Binh Duong province.
-    Decision of Master plan No. 9726/QD-BXD dated July 17th, 2002 of Ministry of Construction on approving the detail plan of My Phuoc IP in Binh Duong province and Decision No.3557/QD-UBND dated August 17th, 2007 of Binh Duong People’s Committee on amendment the detail plan of My Phuoc IP.
 
3.   LAND USE STRUCTURE
 
Type of land
Area (ha)
Percentage (%)
Land for factory
234.9848
62.34
Land for public service center
41.2957
10.96
Land for technical infrastructure
1.9757
0.52
Land for green space
54.445
14.44
Land for transport
44.2224
11.73
Total
376.9236
100
 
-    Address: My Phuoc bourg, Ben Cat district, Binh Duong province, Vietnam.
-    Geographic location: 45 km from Ho Chi MinhCity,14km from Thu Dau Mot City, 32km from Tan Cang, Sai Gon port group, VICT; 42 km from ICD Phuoc Long, 42km from Tan Son Nhat airport.
-       Total capital: 223.7 billion VND.
-       Industrial land for lease: 267.28 ha.
-       Technical infrastructure: completed.
-       Waste water plant: capacity 8,000 m3 per day.
-       Operation time : year 2003.
-       Total implemented capital: 201.15 billion VND.
-       Renting area: 240.9 ha; occupancy rate: 87.19%.​

-Decision No.420/QD-BKHCN dated October 10, 2002 by the Ministry of Science and Technology on the approval of the EIA report

4. SCOPES OF OPERATION

-Manufacture of machines, industrial and household electrical appliances;

-Electronics, informatics, telecommunications;

-Light industries of toys, artificial jewelry products, pottery items and glass wares;

-Warehouses

-Food processing

-Manufacture and assembly of clocks, optical devices;

-Manufacture of fine-art wooden products for export, manufacture of office groceries, home decoration items;

-Manufacture of plastic, metal products and household appliances


Mai Trung Industrial ParkIndustrial ParksBài viếtMai Trung Industrial Park/Style Library/LacViet/CMS2013/Images/newsdefault.jpg
12/10/2016 12:00 PMNoĐã ban hành
1.     INFORMATION ON INVESTOR
 
-    Investor: Mai Trung Investment and Construction private company
-    Address: Mai Trung IP, An Tay commune, Ben Cat district, Binh Duong province, Vietnam.
 
2.     INFORMATION ON INDUSTRIAL PARK
 
-     Decision No. 1475/ CP-CN dated October 06th, 2004 of Prime Minister on establishing Mai Trung Iindustrial Park on the area of 50.55 hectars.
-    Decision of Master plan No. 1836/QD-BXD dated November 26th, 2004 on approving the detail plan of Mai Trung IP in Binh Duong; Decision No. 1857/QD- UBND dated May 03rd, 2007 of Binh Duong People’s Committee on approving the amended detail plan of Mai Trung IP.
 
3. LAND USING STRUCTURE        
 
Type of land
Area (ha)
Percentage (%)
Land for industrial factory
34.61
68.47
Parking public service center
1.49
2.95
Land for green space
5.17
10.23
Land for technical infrastructure
1.04
2.06
Land for transport
7.59
15.01
Other lands
0.65
1.29
Total
50.55
100
 
-       Address: An Tay commune, Ben Cat district, Binh Duong province, Vietnam.
-       Total capital: 84 billion VND.
-       Industrial land for rent: 34.61 ha.
-       Technical infrastructure: to be completed .
-       Waste water plant: not yet.
-       Operation time : year 2005.
-       Total implemented capital: 41.112 billion VND.
-       Renting area: 22.5 ha; occupancy rate: 65%.​

-   Decision No.2725/QD-UBND dated June 20, 2005 by Binh Duong provincial People’s Committee on the approval of the EIA report

4. SCOPES OF OPERATION

-Processing of fine-art and indoor furniture items;

-Assembly of mechanical products;

-Processing of food and agricultural products;

-Electricity and electronics;

-Apparel and leather-footwear;

-Light industry and packaging;

-Assembly, repair of agro-forestry and transport machines.


Ascendas – Protrade Industrial ParkIndustrial ParksBài viếtAscendas – Protrade Industrial Park/Style Library/LacViet/CMS2013/Images/newsdefault.jpg
12/10/2016 12:00 PMNoĐã ban hành

1. Information about the investor

- Name of investor:

         1. Ascendas – Protrade Ltd. Company

         2. Ascendas Vietnam Properties PTE. LTD

- Address: An Tay Commune, Ben Cat District, Binh Duong Province

- Phone: 0274.3786388

- Fax: 0274.3786392

- Website:

- E-mail: ascendas-protrade@com.vn

- Certificate of investment / business registration:

- Registered investment / trading industry:

2. Information on industrial park

- Decision of establishment:

- Investment certificate: No. 462045000306 dated Oct 29, 2007 issued by Binh Duong Provincial Management Board of Industrial Parks

- Decision approving the detailed planning of industrial park: No. 4573/QD-UBND dated Oct 23, 2007 of Binh Duong Provincial People's Committee

3. Land use structure

Type of landArea (ha)Percentage (%)
Land for construction of factories, warehouses335.241767.040
Warehousing land19.64203.928
Land for construction of administrative and service works16.41023.282
Green land50.362210.071
Land for technical infrastructure2.32330.465
Traffic land76.085315.215
TOTAL500,0647100

 

 

- Industrial park address: An Tay Commune, Ben Cat District, Binh Duong Province

- Geographical location:

- Total investment: 2424.75 billion

- The area of leased industrial lands: 335.24 ha

- The nature of industrial park:

- Infrastructure: under construction

- Wastewater treatment plant: under construction

- Year in operation:

- Total disbursed investment: 703.244 billion

- The area of leased land: ha, occupancy rate:%

- Land rental (reference):

- Decision approving the EIA report: No.2099/QD-BTNMT dated Dec 17, 2007 of the Ministry of Natural Resources and Environment

4 Scopes of operation

     - Electricity and electronics;

     - Health care products, pharmaceutical products and food (no processing of fresh seafood);

     - Precision mechanics;

     - Industrial and automotive parts;

     - Auxiliary industry;

     - Light, clean industry (no projects of weaving, dyeing and processing of paper);

     - New building materials (no projects of traditional construction materials such as baked brick, concrete casting).

Viet Huong 2 Industrial ParkIndustrial ParksBài viếtViet Huong 2 Industrial Park/Style Library/LacViet/CMS2013/Images/newsdefault.jpg
12/10/2016 11:00 AMNoĐã ban hành
1.     INFORMATION ON INVESTOR
 
-       Investor: Viet Huong Investment Development Joint Stock Company.
-       Address: Hamlet 2, An Tay commune, Ben Cat district, Binh Duong province, Vietnam.
-       Phone: (+84) 274 3 581 368. Fax: (+84) 274 3 581 378.
-       Website: www.viethuongip.com
-       E-mail: vhip@hcm.vnn.vn
 
          - Investment/business registration certification: Certification of business registration No. 4603000066 issued by Binh Duong Department of Planning and Investment dated Mar 26, 2010; the 4th change dated Jun 26, 2007.
 
          - Fields of business/investment registration: construction, investment and industrial infrastructure trading.
 
2.     INFORMATION ON THE INDUSTRIAL PARK
 
- Decision on the establishment: Decision No. 3681/QĐ-CT of Binh Duong People’s Committee dated Sep 29, 2003 on approving the project of construction and industrial infrastructure trading of Viet Huong 2 industrial park.
 
- Investment certification No. 46221000085 issued by The Management Board of Binh Duong Industrial Zones dated Jan 30, 2007.
 
- Decision on approving detail plan of the industrial park: Decision No. 5157/QĐ-UBND of Binh Duong People’s Committee dated Feb 12, 2003.
 
3.     LAND USE STRUCTURE
 
Type of land
Area (ha)
Percentage (%)
Land for constructing plants, warehouses
168.59
67.44
Land for constructing public service works
12.74
5.09
Land for trees, parks
35.88
14.35
Land for technical infrastructure
3.23
1.29
Land for traffic
29.57
11.83
Total
250
100
 
-       Address: Hamlet 2, An Tay commune, Ben Cat district, Binh Duong province, Vietnam.
-       Location: about 45km away from Tan Son Nhat International Airport; about 35km away from The New Port; about 08km away from Highway 13; about 20km away from Song Than Station; about 45km away from the center of Ho Chi Minh City.
-       Total investment capital: VND 270.4 billion.
-       Industrial land area for rent: 168.59 hectare.
-       Form of the industrial park: textile dyeing industry, shoes and shoes material manufacture, wood processing, interior decorating with wood, plastic, products of technology, electronics, and automatic, etc. 
-       Technical infrastructure: completed.
-       Sewage treatment plant: the capacity of 2000 m3/day.
-       Year started operations: 2007.
-       Total implementation capital: 202.7 billion.
-       Land area for rent: 123.44 hectare, account for 73.22%.
-       Land price (only reference): 38USD/m2.

-     Decision No.2663/QD-UBND dated June 15, 2005 by Binh Duong provincial People’s Committee on the approval of the EIA report

4. SCOPES OPERATION

-Dyeing, textile, garment, footwear-leather, tanning;

-Electronics, electricity and machinery;

-Manufacture of building materials, pottery items, household wooden products, household appliances, office groceries;

-Processing of forestry-fishery products


Kim Huy Industrial ParkIndustrial ParksBài viếtKim Huy Industrial Park/Style Library/LacViet/CMS2013/Images/newsdefault.jpg
12/10/2016 4:00 AMNoĐã ban hành
1.     INFORMATION ON INVESTOR
 
-    Investor: Kim Huy Industrial Park Development Co., Ltd
-    Address: 27/3 DT 743 – Binh Quoi, Binh Chuan ward, Thuan An town, Binh Duong province, Vietnam.
-    Tel: (+84) 274 3 815 015. Fax: (+84) 274 3 815 014.
-    Website: www.kcnkimhuy.com.vn
-    E-mail: hai@kcnkimhuy.com.vn
-    Business license No. 4602002278 dated September 11st, 2006 issued by Binh Duong Department of Planning and investment.
-    Registered business: Business and construction of technical infrastructure of IP and residential apartment (under the provincial plan); land leveling; construction investment; real estate (warehouse, housing, office for rent and sale).
 
2.     INFORMATION ON INDUSTRIAL PARK
 
-    Investment Certificate No. 46221000042 dated April 24th, 2007 issued by Binh Duong Industrial Park Board of Management
-    Decision of Master plan No. 3141/QD-UBND July 07th, 2006 of Binh Duong People’s Committee.
 
3.USING LAND STRUCTURE         
 
Type of land
Area (ha)
Percentage(%)
Land for factory, warehouse
144.69
67.73
Parking area
2.58
1.21
Land for public service center
5.04
2.36
Land for green space
22.28
10.43
Land for technical infrastructure
5.97
2.79
Land for transport
29.73
13.91
Other lands
3.35
1.57
Total
213.63
100
 
-       Address: Phu Tan Ward, Thu Dau Mot City, Binh Duong province, Vietnam.
-       Location: 45km from Cat Lai port, 40 km from Tan Son Nhat airport.
-       Total capital: 254.4 billion VND.
-       Industrial land for rent: 144.69 ha.
-       Waste water plant: capacity 2,000 m3 per day.
-       Operation time : year 2006.
-       Total implemented capital: 194 billion VND
-       Renting area: 73.1 ha; occupancy rate: 50.52%
-       Renting price (reference): 55 USD/m2, management fee: 0.6 USD/m2​

        -    Decision No.4924/QD-UBND dated March 11, 2006 by Binh Duong provincial People’s Committee on the approval of the EIA report

4.   SCOPES OF OPERATION

  •  Apparel, hi-class feather-footwear;
  • Manufacture and assembly of mechanical products;
  • Processing of hi-class furniture products;
  • Some other industries not causing environmental pollution.
Tan Binh industrial ParkIndustrial ParksBài viếtTan Binh industrial Park/Style Library/LacViet/CMS2013/Images/newsdefault.jpg
12/10/2016 12:00 AMNoĐã ban hành

1. Information about the investor

TAN BINH JOINT STOCK COMPANY

Address: Tan Binh Commune, North Tan Uyen District, Binh Duong Province, Vietnam

Tel: (0274) - 6 566 668/3 687 888 - Fax: (0274) - 3.687.888

Email: tanbinh@tanbinhip.com - Website: http://www.tanbinhip.com

- Three major shareholders:

+ Phuoc Hoa Rubber Joint Stock Company: 80%

+ South Tan Uyen Industrial Park Joint Stock Company: 15%

+ Duc Vietnam Ltd. Company: 5%

- Date of establishment: Jul 9, 2012.

2. Legal documents:

- Document No. 1158/TTg-KTN of the Prime Minister dated Jul 8, 2010 on adding Tan Binh Industrial Park - Binh Duong Province to the planning of industrial park development in Vietnam.

- Decision No. 252/QD-UBND of Binh Duong Provincial People's Committee dated Feb 2, 2012 on approving the detailed plan of Tan Binh Industrial Park in Tan Binh Commune, North Tan Uyen District, Binh Duong Province.

- Certificate of business registration Joint Stock Company No. 3702068452 issued by Binh Duong Provincial Department of Planning and Investment the first change on Aug 6, 2013;

- Investment Certificate No. 46221001014 by Binh Duong Provincial Management Board of Industrial Parks first time on Sep 12, 2013.

3. Scopes of operation: Investment, construction and trading of technical infrastructure of industrial parks; accommodation, leasing of offices, factories, warehouses, wharves ...

4. Information about the industrial park

Total investment: Over VND830 billion (about $40 million)

Total area: 352.5 ha (3,525,000 m2)

Land use structure:

 

Type of land

Area (ha)

Percentage (%)

Land for construction of industrial enterprises

244.4925

69.360

Land for operating works and other services

8.8363

2.507

Key works

4.5537

1.292

Traffic land

54.7518

15.533

Green land

39.8628

11.309

Total

352.4971

100


* Advantages of the industrial park:

- Being located in the area of ​​preferential corporate income tax rates (exemption in the first 2 years, 50% tax reduce in the next 4 years);

- Favorable geographical location;

- Abundant raw materials from rubber trees (latex, wood, ...) offered by Phuoc Hoa Rubber Joint Stock Company and small plantations;

- Many preferential policies of land sublease for first investors and flexible payment schedules;

- Land can be handed over immediately to investors without problems of land clearance and compensation;

- Effective business environment: synchronous complete infrastructure, durable foundation (capacity of 1.6 - 2.0kg/cm2), waste water treatment plants, power plants, clean water plants etc;

- Support of local authorities; supported licensing procedure;

- Abundant labor force.

* The industrial park receives clean industrial sectors with less pollution rate:

- Processing of agricultural and forestry products, especially rubber products, such as rubber tires, auto parts, motorcycles, home appliances, plastics, ...;

- Manufacture of furniture, especially from rubber wood;

- Industries serving agricultural development, mechanical engineering, farm machinery and equipment, fertilizers, ...;

- Production of consumer goods for domestic consumption and exports, such as garments, electronic products, home appliances, all kinds of packaging ...;

- Production of building materials: interior decorative items, building materials, structural frames, roofing, cover sheets...;

- Manufacture of pharmaceuticals, cosmetics, ...;

- Processing of food, flavoring, chemicals, ...

* Products for lease:

- Complete infrastructure, which is ready to serve the construction of plants.

- Available or on-demand standardized plants.

Dong An 2 Industrial ParkIndustrial ParksBài viếtDong An 2 Industrial Park/Style Library/LacViet/CMS2013/Images/newsdefault.jpg
12/6/2016 5:00 AMNoĐã ban hành
1.     INVESTOR INFORMATION
 
-    Investor: Hung Thinh Construction –Trade and Production Joint stock Company
-    Address: Dong An IP – Binh Hoa ward, Thuan An town, Binh Duong province, Vietnam.
-    Tel: (+84) 274 3 752 130 – (+84) 274 3 743 495. Fax: (+84) 274 3 742 016.
-    Website: http://dongan-group.com
-    E-mail: Hungthinh@dongancorp.com
-    Business License: No. 3700147483; issued date: 21/12/1994 by Binh Duong Department of Planning and Investment.
-    Registered business: industrial and civil construction; real estate, warehouses, offices and houses for rent; waste water treatment and vocational training.
 
2.   INFORMATION PARK INDUSTRIAL
 
-    Investment Certificate No. 46221000130 dated November 09th, 2007 issued by Binh Duong Industrial Park Board of Management
-    Decision of Master plan No. 4666/QD-UBND October 17th, 2006 of Binh Duong People’s Committee.
 
3.   USING LAND STRUCTURE         
 
Type of land
Area (ha)
Percentage(%)
Land for factory
102,071
64,556
Land for warehouse
1,971
1,247
Land for public service center
2,185
1,382
Land for green space, park, lake and Hoa Loi canal
21,771
13,769
Land for technical infrastructure and waste water treatment
3,163
2,000
Land for transport
22,689
14,350
Land for worker housing
4,263
2,696
Total
158,113
100
 
-    Address: Hoa Phu ward, Thu Dau Mot city, Binh Duong province, Vietnam.
-    Geographic location: in Binh Duong Industrial – Service and Residential Complex, 40 km from Ho Chi MinhCity, 39km from Sai Gon, 37km from Tan Son Nhat airport, 25km from Song Than railway station.
-       Total capital: 245.308 billion VND.
-       Industrial land for rent: 103.18 ha.
-       Waste water plant: capacity 2,500 m3 per day.
-       Operation time : year 2006.
-       Total implemented capital: 209.197 billion VND.
-       Renting area: 89.35 ha; occupancy rate: 86.5%.
-       Renting price (reference): 50USD/m2for using until 2056.​

-    Decision No.5973/QD-UBND dated December 29, 2006 by Binh Duong provincial People’s Committee on the approval of the EIA report

Scopes of operation

-   Manufacture of electronic components;

-   Industrial manufacture on contract;

-   Processing of consumer and food products;

-   Mechanism and building materials.


Thanh An Industrial clusterIndustrial ClustersThanh An Industrial cluster/Style Library/LacViet/CMS2013/Images/newsdefault.jpg
11/11/2016 4:00 PMNoĐã ban hành

1. Investor information:

  • Cuu Long Company Limited
  •  Add: Binh Duc Quarter, Binh Hoa Commune, Thuan An town, Binh Duong province.
  •  Tel: (0274) 3755597, 3755596;
  •  Fax: (0274) 3 755593
  • E-mail:  kieu.trinh@cc.com.tw
2. Industrial Cluster information:
  • Approved plan: Detail plan was approved in August 2006
  • Add: Thanh An Commune, Dau Tieng district, Binh Duong province.
  • Year of establishment: 2006
  • The approved Detail construction Plan in November 2002
  • Total investment capital: 140 billion VND;
  • Planned area: 41.1686 hectares. Adjusted detailed construction plan in July 2008 with total area of 49.583 hectares in which, industrial construction area is 48.45 hectares.
  • Wastewater treatment : to be constructed
  • Investment attraction: 0 projects.
Uyen Hung Industrial clusterIndustrial ClustersUyen Hung Industrial cluster/Style Library/LacViet/CMS2013/Images/newsdefault.jpg
11/11/2016 4:00 PMNoĐã ban hành

1. Investor information:

  • - Binh Duong Forest Products and General import - export Joint Stock Company
  •  Add: 612 Binh Duong Boulevard, Hiep Thanh Ward, Thu Dau Mot City, Binh Duong province.
  •  Tel: 0274 822 612 - 0274 822 243;
  •  Fax: (0274) 824 113
  •  Email: genimex@genimex.com.vn;
  •  Website: http://www.genimex.com.vn,
2. Industrial Cluster information:
  • Approved plan: Detail plan was approved in August 2005
  • Add: Uyen Hung Ward, Tan Uyen Town, Binh Duong province.
  • Located in favorable position and traffic, Uyen Hung Industrial Cluster is close to trade - service - residential Center and has with total area of 22.5 hectares
  • Total investment capital: 202.545 billion VND;
  • Planned area: 158 hectares ( The adjusted detailed construction plan was approved by Binh Duong People's Committee in August 2009 with total area of 122.296 hectares in which 78.1143 hectares for industrial construction;
  • Investment attraction: prepare documents for investment project land leasing of 90.89519 hectares. Land leasing contract was signed for 03 projects with area of 14.7 hectares.
  • Wastewater treatment : Wastewater treatment Plant (capacity 3,000 m3 per day) was completed its phase I (capacity 3,000 m3 per day ) and in operation since January 2013
Tan My Industrial clusterIndustrial ClustersTan My Industrial cluster/Style Library/LacViet/CMS2013/Images/newsdefault.jpg
11/11/2016 4:00 PMNoĐã ban hành

1. Investor information:

  • TOT I Company limited;

  •  Add:  1665 Binh Duong Boulevard, Hiep An Ward, Thu Dau Mot City

  • Phone: 0274. 3898942

2. Industrial Cluster information:

  • Approved plan: Detail plan was approved in March 2007
  • Add: Tan My Commune, Bac Tan Uyen District, Binh Duong province.
  • Located in favorable position, on the provincial Road No.746, Tan My Industrial Cluster is adjacent to Saigon river, and to the Ring Road 5.
  • Total investment capital: 300 billion VND in which 105.705 billion VND were disbursed.
  • Planned area: 100 hectares (The adjusted detailed construction plan approved by Binh Duong People's Committee with total area of 88.8771 hectares in which 71.6446 hectares for industrial construction; resettlement area moved to the West of the Industrial Cluster)
  • Wastewater treatment : Wastewater treatment Plant (capacity 2,000 m3 per day) was started its phase I (capacity 500 m3 per day ) in July 2011;
  • Investment attraction: the Industrial Cluster was granted its investment certificate, permitting land lease of 80.65101 hectares. 01 operating furniture company with area of 5 hectares . Land leasing contract was signed for 03 projects with area of 3.4 hectares in 2012.
Beautiful City Industrial clusterIndustrial ClustersBeautiful City Industrial cluster/Style Library/LacViet/CMS2013/Images/newsdefault.jpg
11/11/2016 4:00 PMNoĐã ban hành

1. Investor information:

  • Beautiful City Joint Stock Company;
  • Add: Group 1, Quarter Ong Dong, Tan Hiep Ward, Tan Uyen town, Binh Duong province 
  • Tel: 02743858364  
  • Fax: 0274385836 
2. Industrial Cluster information:
  • Add: Tan Hiep Ward, Tan Uyen town, Binh Duong province
  • Approved plan: Detail plan was approved in June 2005.
  • Year of establishment: 2005
  • Total investment capital: 50 billion VND
  • Planned area: 55.59 hectares (The adjusted detailed construction plan approved by Binh Duong People's Committee with total area of 26.2243 hectares in which 18.3353 hectares for industrial construction; resettlement area moved to the West of the Industrial Cluster)
  • Wastewater treatment : Wastewater treatment Plant (capacity 1,200 m3 per day) was constructed.
  • Investment attraction: 13 projects (9 operating projects and 04 projects having investment certificates. Industrial areas are occupied 100%.
Phu Chanh Industrial clusterIndustrial ClustersPhu Chanh Industrial cluster/Style Library/LacViet/CMS2013/Images/newsdefault.jpg
11/11/2016 4:00 PMNoĐã ban hành

1. Investor information:

  • Cheng Chia Wood Company Limited (Taiwan)
  • Add: Uyen Hung Ward, Tan Uyen town, Binh Duong province 
  • Tel: 02743 3641788  
  • Fax: 02743 3641787
  • Email: chengchiawood@vnn.vn.
2. Industrial Cluster information:
  • Add: Phu Chanh Ward, Tan Uyen town, Binh Duong province

  • Approved plan: Detail plan was approved in June 2007.

  • Year of establishment: 2007
  • Location: near Binh Duong New City main roads and industrial Parks
  • Total investment capital: 318.7 billion VND
  • Planned area: 127.8559 hectares (The adjusted detailed construction plan in May 2010 with total area of 119.9945 hectares in which 83.5761 hectares for industrial construction)

  • Wastewater treatment : to be constructed.

Tan Dong Hiep Industrial clusterIndustrial ClustersBài viếtTan Dong Hiep Industrial cluster/Style Library/LacViet/CMS2013/Images/newsdefault.jpg
11/11/2016 3:00 PMNoĐã ban hành

1. Investor information:

  • Binh Duong Investment and Industrial Development Joint Stock Company (Becamex IDC.)
  • Add: 230, Binh Duong Ave, Thu Dau Mot city, Binh Duong province.
  • Tel: (0274) 3 82 2655.
  • Fax: (0274) 3 822 713.
  • E-mail: info@becamex.com.vn
2. Industrial Cluster information:
  • Add: Tan Dong Hiep Ward, Di An Town, Binh Duong province.
  • Year of establishment: 2002
  • The approved Detail construction Plan in November 2002
  • Total investment capital: 64.937 billion VND (compensation: 8.2 billion VND, infrastructure: 48.649 billion VND, others: 8.088 billion VND)
  • Planned area: 57.997  hectares (industrial construction area: 48.45 hectares, account for 83.5%
  • Wastewater treatment plants: to be constructed
  • Investment attraction: The Industrial Cluster is occupied by 07 operating projects.
3. Fields: Components production for bikes, cars; shoes processing for export.
 Binh Chuan Industrial clusterIndustrial ClustersTin Binh Chuan Industrial cluster/Style Library/LacViet/CMS2013/Images/newsdefault.jpg
11/11/2016 3:00 PMNoĐã ban hành

1. Investor information:

  • Binh Duong Investment and Industrial Development Joint Stock Company (Becamex IDC.)
  • Add: 230, Binh Duong Ave, Thu Dau Mot city, Binh Duong province.
  • Tel: (0274) 3 82 2655.
  • Fax: (0274) 3 822 713
  • E-mail: info@becamex.com.vn
2. Main business line:
  • Textile and dyeing, fabric yarn manufacturing;
  • Packages manufacturing;
  • Construction material manufacturing and interior decoration;
  • Mineral production (bentonite);
  • Agricultural products processing;
  • Mechanical processing and manufacturing;
  • Chemical manufacturing;
  • Sporting goods manufacturing;    
  • Shoes production;
  • Electrical appliances manufacturing.

3. Industrial Cluster information:

  • Add: Binh Chuan Ward, Thuan An Town, Binh Duong province
  • The approved detail construction Plan in December 1996
  • -Year of establishment: 1996
  • The approved detail plan area: 67.5 hectares.
  • The cleared area: 67.5 hectares;
  • Wastewater treatment plants: to be constructed
  • Total investment capital: 37.667 billion VND
  • Planned area: 67.5 hectares (industrial construction area: 60.08 hectares, account for 89%)
  • Investment attraction: The Industrial Cluster is occupied by 16 operating projects.
4. Fields: Binh Chuan Industrial Cluster attracts diverse fields including dyeing and textile, packaging, mineral production, construction material mechanics, chemicals, shoes, electrical appliances, household electrical appliances.
Tax PolicyPreferential and attractive policyBài viếtTax Policy/Style Library/LacViet/CMS2013/Images/newsdefault.jpg
11/10/2016 1:00 PMNoĐã ban hành
Follow Decree no. 164/2003/ND-CP of December 22, 2003 detailing the implementation of the Law on Enterprise Income Tax; Decree no.152/2004/ND-CP of August 6/2004 Amending and Supplementing a number of articles of the Government’s Decree no. 164/2003/ND-CP of December 22, 2003 detailing the implementation of the Law on Enterprise Income Tax
 
An Thanh industrial clusterIndustrial ClustersBài viếtAn Thanh industrial cluster/Style Library/LacViet/CMS2013/Images/newsdefault.jpg
11/10/2016 1:00 PMNoĐã ban hành

1.      Investor information:

  • Binh Duong Investment and Industrial Development Joint Stock Company (Becamex IDC.)

  • Add: 230, Binh Duong Ave, Thu Dau Mot city, Binh Duong province.

  • Tel: (0274) 3 82 2655.

  • Fax: (0274) 3 822 713.

  • E-mail: info@becamex.com.vn

2.      Industrial Cluster information:

  • Add: An Thanh Ward, Thuan An Town, Binh Duong province.

  • Year of establishment: 2001

  • The approved Detail construction Plan in April 2001

  • Total investment capital: 73.320 billion VND

  • Planned area: 46.1 hectares (industrial construction area: 30.5 hectares, account for 65.1%)

  • Wastewater treatment plants: to be constructed

  • Investment attraction: An Thanh Industrial Cluster is occupied by 04 operating projects

3.       Fields calling for investment: Shoes, steel and iron, warehouses, furniture
Phu Gia Industrial ParkIndustrial ParksBài viếtPhu Gia Industrial Park/Style Library/LacViet/CMS2013/Images/newsdefault.jpg
11/10/2016 12:00 PMNoĐã ban hành
1. INFORMATION ON INVESTOR
 
-     Investor: Ho Chi Minh General Import Export and Investment Joint Stock Company (IMEXCO)
-     Address: 49 Hoang Viet street, Ward 4, Tan Binh district, Ho Chi Minh City, Vietnam.
-     Tel: (+84) 28 3 811 5895 – (+84) 28 3 811 5897.
-     Fax: (+84) 28 3 8115 825.
-     Website: www.imexco.vn
-     Registered business: Construction and business in industrial park infrastructure, residential area; house trading, leasing office and warehouse for business; trading, processing and manufacturing agricultural products, seafood products, fine arts and crafts, etc.
 
2. INFORMATION ON INDUSTRIAL PARK
 
-     Decision of establishment: Document no. 912/QD-TTg of Prime Minister dated 1 Sep 2005 on approving the Master Plan of Binh Duong Industrial – Service – Urban Complex .
-     Investment Certificate: no. 46221000039 dated 8 Dec 2006 1st amendment issued on 5 April 2007 by Binh Duong Industrial Zone Management Board.
-     Decision on master plan of the industrial park: no. 2933/QD-UBND issued by Binh Duong People’s Committee dated 22 June 2006 on the master plan of Phu Gia Industrial Park under Binh Duong Industrial – Service – Urban Complex.
 
3. LAND USE STRUCTURE
 
Type of land
Area (ha)
Percentage (%)
Land for industrial factory construction
85.63
64.2429
Land for central infrastructure works construction
2.87
2.1546
Land for service management work construction
2.85
2.1344
Land for trees and parks
17.64
13.2305
Land for transportation works
18.20
13.6543
Land for specialist housing construction
2.19
1.6490
Land for worker housing construction
3.91
2.9341
TOTAL
133.29
100
 
-     Address: Phu Hoa ward, Thu Dau Mot city, Binh Duong province, Vietnam.
-     Total investment capital: 530.598billion VND.
-     Total industrial land for leasing: 85.63 hectares.
-     Infrastructure: Under finishing.
-     Waste water treatment factory: with the designed capacity of 1,000 m3 per day.
-     Year of operation: year 2007.
-     Rental land area: 71.03 hectares. Fulfill 19.88%.​

1 - 30Next