News
Thứ 3, Ngày 27/10/2020, 14:00
Period 2020-2025: Binh Duong will perform series of key projects
Cỡ chữ: Font size: Giảm (A-) Mặc định (A) Tăng (A+)
27/10/2020 | Thanh Hung

PORTAL - Implementing the Resolution of the 11th Party Congress of Binh Duong Province, in the period 2020-2025, Binh Duong will implement a series of road and waterway transport projects with the goal of developing smart industries, smart, modern.

Request the Central to accelerate projects according to planning

In order to reduce traffic pressure for provinces and cities of the Southern key economic region, especially vehicles transporting goods from industrial zones and clusters in Binh Duong province, investment in a closed Ring Line 3 is very urgent. Therefore, in the medium term period 2021 - 2025 will continue to petition the Government and the Ministry of Transport to soon invest in Ring Line 3, section from Binh Chuan - Highway 22, especially early investment in bridges across the Saigon river on the route. At the same time, it is recommended to the Government and the Ministry of Transport to consider early investing in a bridge across the Saigon river of the Ring Line 4 and the section from the Saigon river to DT.744 road to connect with Ho Chi Minh city. In which, prepare investment in the period 2021 - 2025, make investment, put into operation in the period 2026 - 2030.

Binh Duong also proposed that the Government and the Ministry of Transport soon invest in the Ho Chi Minh City - Thu Dau Mot - Chon Thanh expressway; propose the implementation of investment preparation in the medium-term plan 2021 - 2025, implement investment, put into operation in the period 2026 - 2030. At the same time, propose the People's Committee of Ho Chi Minh city to coordinate To invest in upgrading and expanding Provincial Road 43, section from Go Dua crossroads to the intersection of Doc Lap boulevard. To propose the Government and the Ministry of Transport to soon re-start the investment in the complete construction of Ho Chi Minh road, passing through Binh Duong province according to the approved scale.

Early implementation and completion of key projects

In order to create favorable conditions for the industry to develop sustainably, in the period 2020-2025, Binh Duong will soon complete and put into use for the routes of Tan Van - My Phuoc - Bau Bang with the length of 48.8km; Project of improving and expanding Highway 13, section from Vinh Binh bridge (Km1 + 315) to Le Hong Phong intersection (Km13 + 990), is 12.67 km long with 8 lanes; Project of upgrading DT.743 road from Mieu Ong Cu to Song Than flyover with a scale of 6-8 lanes; North Tan Uyen - Phu Giao - Bau Bang Power Road 47.3 km long, size of 06 lanes; Project to build a bridge over Dong Nai river (Bach Dang 2 bridge); Project to build roads and bridges connecting Binh Duong and Tay Ninh provinces; Project on Thu Bien - Dat Cuoc road; Public transport infrastructure improvement project in Binh Duong province; to upgrade and expand DT.746 from Tan Thanh junction to Hoi Nghia.

 

Expand Highway 13 to facilitate goods circulation

Projects implementing investment preparation, investment execution and construction in the period 2020 - 2025 include: Project on investment in the construction of roads from Song Than overpass to Pham Van Dong street; Project of overpass (underpass) Phuoc Kien 5 crossroads, Cho Dinh crossroads, Cay Dua market crossroads; Project Create landscape, fight traffic jams on the My Phuoc - Tan Van route, DT.746, DT.747B, DT.743; Investment project to build smart traffic system in Binh Duong province.

Project on widening the road surface and building a synchronized vertical drainage system on DT.744, passing through the area of Ben Cat town and Dau Tieng district; Project on investment and construction of Ring road 4, Dat Cuoc - Thoi Hoa section and Ring Line 4, section from DT.748 to adjacent to Saigon river; Project to build Ring Line 3, section from Binh Chuan to Highway 13; Project on investment and construction of a drainage system along DT.747a, section from Ba Nghia slope (Km16 + 700 to Km31 + 280).

Hieu Liem bridge construction investment project connecting Vinh Cuu district, Dong Nai province; Investment project to upgrade and expand DT.750 from Highway 13 to Lang 10 intersection; Project on investment and construction of traffic infrastructure and drainage in the planned area of the new Binh Duong bus station.

In addition, Binh Duong continues to direct the implementation of the inland waterway system in the province, calling for investment in a number of ports such as An Son port, An Tay port, Rach Bap port, An Dien dry port, Phu Cuong Thinh port, Thanh An port, Tan Van port, Thai Hoa port, Nguyen Ngoc port...

Regarding railway, to reduce traffic pressure on the road system, continue to advise the Provincial People's Committee to propose to the Government and the Ministry of Transport to build a number of railway lines such as: A railway connecting industrial zones Binh Duong province to Thi Vai - Cai Mep port cluster; extending Metro Line 1 of Ho Chi Minh city to Binh Duong and Dong Nai provinces.

Lượt người xem:  Views:   1513
Chia sẻ:
Share:
Others
 
 
Manage PermissionsManage Permissions
|
Version HistoryVersion History

Tiêu đề

Hình ảnh

Hình ảnh mô tả

Tóm tắt

Nội dung

Link thay thế nội dung

Ngày xuất bản

Tin nổi bật(Time)

Tác giả

Số Trang

Số Ảnh

Số tiền

Trạng thái

Lịch sử

Số lượt người đọc

Phân loại

Loại bài viết

Audio

Tin liên quan

Từ khóa

Email

Hệ số ảnh

Hệ số lương cơ sở

Hệ số tin

LuongCoSo

Tiền nhuận bút

Tin nổi bật

Approval Status

Attachments

Content Type: Tin Tức Mở Rộng
Version:
Created at by
Last modified at by
News